Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Aboukhadra, W (2021) Learning organisation, affective commitment and cultural intelligence: the case of expatriates in the Gulf Co-operation Council countries, Unpublished PhD Thesis, , Nottingham Trent University.

Adnan, H B (2004) Joint venture projects in Malaysian Construction Industry Factors Critical to success, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions, Unpublished PhD Thesis, , Nottingham Trent University.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran, Unpublished PhD Thesis, School of Science and Technology, Nottingham Trent University.

Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Coupar, G (2009) Modern approaches to repairs and maintenance procurement within the social housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Dowd, V G (1999) The pervading role of risk allocation as the link mechanism between factors of influence and construction procurement practices adopted in the UK construction industry over the period 1965-1995, Unpublished PhD Thesis, , Nottingham Trent University.

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects, Unpublished PhD Thesis, , Nottingham Trent University.

Grada, M (2007) The impact of economic value added measure in assessing the business performance of UK construction companies, Unpublished PhD Thesis, , Nottingham Trent University.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance, Unpublished PhD Thesis, , Nottingham Trent University.

Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Hurst, A G (2009) Management education, training and development of construction managers: will they ever learn?, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Jaafar, T (1992) A unified methodology for project planning risk, Unpublished PhD Thesis, , Nottingham Trent University.

Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Keats, R J (2014) An exploration of how professional associations advance innovation and promote innovation pedagogy, Unpublished PhD Thesis, , Nottingham Trent University.

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors), Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Khalid, U (2022) Investigation into the development of a human reliability analysis framework for the safety management of construction projects, Unpublished PhD Thesis, , Nottingham Trent University.

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach, Unpublished PhD Thesis, , Nottingham Trent University.

McLean, M (2014) A longitudinal analysis of a partial mediation model of employee engagement in a knowledge-intensive firm, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

  • Type: Thesis
  • Keywords: case study; document analysis; employee engagement; feedback; focus group; green building; interview; job satisfaction; mediation; recession; UK
  • ISBN/ISSN:
  • URL: https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.664737
  • Abstract:
    Research interest in employee engagement (EE) has recently intensified. This thesis document (the study) adds to our understanding of EE by conceptually developing and empirically testing a partial mediation model of EE within a smaller knowledge-intensive setting. The study’s aim is to longitudinally examine whether, how and why there were changes in the level and nature of EE and in satisfaction with antecedents of engagement. Linkages between these constructs are explored. An HRM ‘black box’ is thus investigated. The case study organisation, site of the empirical work, is Integrated Environmental Solutions (IES), a world leading high-tech company which supplies software and professional services to the architecture, engineering and construction sector to aid green building design and reduce energy consumption in new and existent buildings. The research methodology in this study adopts a realist stance. Quantitative and qualitative data were gathered between 2008-2010 via three employee surveys, interviews, focus groups and company documents during a period of great market turbulence at IES. The results reveal that overall EE rose to a very high level, contrary to the general trends observed in the UK. Emotional engagement remained high and stable, while both cognitive and behavioural engagement levels significantly improved. Despite a volatile business background, it seems that the strategic company responses to survey feedback via targeted actions and HR interventions sustained (or improved) satisfaction with all antecedents of engagement, apart from that of rewards and recognition. This longitudinal study suggests that four antecedents can be described as fundamental drivers of high engagement within a knowledge-intensive firm during this difficult period: long-term strategic direction and alignment; a strong people-centric culture; job satisfaction and knowledge-sharing. There is a paucity of prior longitudinal academic study into EE, especially in a knowledge-intensive context and in a recession; this study contributes to these knowledge gaps. Further, the study offers conceptual insights into a contextualised partial linkage model of EE and an analysis of how an EE strategy can be implemented in practice. The study thereby advances the limited extant studies, directly contributing to gaps in knowledge, methodological approaches and our understanding of practice. Moreover, implications for professional practice and future research direction are explicated in the study’s conclusions.

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Owen, K J (2002) Success factors in the procurement of privately financed tolled transportation infrastructure projects in the UK, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Payne, B (1998) Project risk analysis, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Pritchard, C (2005) Skin cancer prevention in the house building industry, Unpublished PhD Thesis, , Nottingham Trent University.

Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020', Unpublished PhD Thesis, , Nottingham Trent University.

Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context, Unpublished PhD Thesis, , Nottingham Trent University.

Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach, Unpublished PhD Thesis, , Nottingham Trent University.

Ward, A D (2016) Development of a contextualised understanding of the diffusion of innovation among quantity surveyors in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.